Grimard carried out the electrical work for Phase 5 in the redevelopment of the Port of Montréal’s Viau sector and for the development of sections 48–53 of the terminal. The main work done by Grimard falls into these broad categories:

Modification of substation 47: installation of lighting towers and streetlights; supply, installation and connection of medium-voltage equipment, splitter and communication boxes, access shafts and underground electrical cables; construction of reinforced concrete beds; supply and connection of the gatehouse post; testing and reports; supply, installation and connection of cabinets; connection of transformers and detection loops.

Products / services
Electricity, road lighting, civil engineering work

Sector
Infrastructure

Related Projects