Below are some of our joint accomplishments: |
(2008-2009) Supply and installation of 750-VDC disjunction cabinets and related panels for Line 1 West.
ÉLECTRICITÉ GRIMARD: Installation of 650 VDC disjunction cabinets and related panels in 9 substations.
AUTOMATISATION GRIMARD: Design and fabrication of the equipments for the 9 substations, i.e., disjunction cabinets, alarm and automation supervision systems, auxiliary service panels, transformer/rectifier group alarm management panels and communications network.
Bear Montain station, Vancouver (2008-2009).
Off-site construction of a control building.
CONSTRUCTION GRIMARD: Construction of the building.
AUTOMATISATION GRIMARD: Engineering, fabrication and incorporation of control panels.
ÉLECTRICITÉ GRIMARD: Building’s electrical installation and connection of control panels.