Home  | Site plan  | Careers  | Contact us  | Français  |

Électricité

Below are some of our joint accomplishments:

Montréal Metro

(2008-2009) Supply and installation of 750-VDC disjunction cabinets and related panels for Line 1 West.

ÉLECTRICITÉ GRIMARD: Installation of 650 VDC disjunction cabinets and related panels in 9 substations.

AUTOMATISATION GRIMARD: Design and fabrication of the equipments for the 9 substations, i.e., disjunction cabinets, alarm and automation supervision systems, auxiliary service panels, transformer/rectifier group alarm management panels and communications network.

BC Hydro (British Columbia Hydro and Power Authority)

Bear Montain station, Vancouver (2008-2009).
Off-site construction of a control building.

CONSTRUCTION GRIMARD: Construction of the building.

AUTOMATISATION GRIMARD: Engineering, fabrication and incorporation of control panels.

ÉLECTRICITÉ GRIMARD: Building’s electrical installation and connection of control panels.

Laval metro

(2005-2006) Extension of the metro to Laval. Line traction equipment.

ÉLECTRICITÉ GRIMARD: Power supply and installation of line traction equipment.

AUTOMATISATION GRIMARD: Supply of disjunction cabinets and 750-VDC traction equipment.

Top of page

Grimard's main strength resides in the expertise of its five divisions and the synergy between them.

News

Opening of a Sept-Îles office...
Read the rest »

Patrice Corneau, ing. is appointed integration manager at Grimard...
Read the rest »

"Métro de Montréal : un chantier exigeant." Published in the CHOC Oct 2009 magazine...
Read the rest »